For new “Genesis” multiphase level meter (Magnetrol / Ametek):
A major Oil and Gas company – refinery, USA.
4 meter diameter, 5 meter long Desalter.
A major Oil and Gas company, USA.
2 meter diameter, 6 meter long Test Separator.
A major Oil and Gas company – refinery, USA.
6 meter diameter, 15 meter long Slug Catcher.
International Oil and Gas company – natural gas plant, Canada.
3 meter diameter, 10 meter long Separator.
An american Oil and Gas company.
USA
4 meter diameter, 12 meter long Separator.
The first delivery and installation of Genesis in Europe takes place in Norway.
Genesis under delivery spring 2023:
– Iraq
– Norway, offshore platform
– Scotland (two units)
– Africa
Subject.
more info about the new multiphase level meter in separator – Genesis from Magnetrol:
see another subpage on our website.
Flere nyheter
ONS 2024
August 22, 2024
Meet us at ONS in hall 7 (see hall map). Join us at our evening event Mon 26. Aug.
Recruitment company MDE customer case
March 7, 2024
MDE Group customer case Håland Instrumentering - video and info.
New general manager
December 20, 2023
Delivery to the world's first hydrogen-powered asphalt plant, large carbon capture order and new subsea valve delivery.